Work packages
The technical development work carried out within BESST project is coordinated by System Groups (SG).
Each System Group clusters from 2 to 4 SG Subprojects or work packages (WP) of BESST project. Subprojects will develop new technical solutions, prove their feasibility in specific prototype applications and document the achievements in a generic way, so that they can easily be adapted to real ships. In addition, each subproject will develop specific life cycle performance assessment methods in the frame provided by WP01-HA-A, and perform an analysis of the impact of their results for the life cycle performance of the ship.
To view the description and contact of the "Work Packages" click the name.
-
BESST — Breakthrough in European Ship and Shipbuilding Technologies
- WP01 - HA.A — Life Cycle Performance Assessment – Methods and Tools
- WP02 - HA.B — The Virtual BESST Ship – Integration Case
- SG I — System Group one - Space Optimisation and Easy Maintenance
- SG II — Improving Payload and Gross Tonnage Ratio
- SG III — Cost Efficient Building Process and Refurbishment
- SG IV — Improved Energy Efficiency and reduced Emissions
- SG V — System Groupe five - Noise and Vibration
- SG VI — Improved Reliability through Condition Monitoring
- SG VII — Optimization of Logistic Chains
- SG VIII — Improving Safety and Security
- WP22 - SA.1a — Project Management
- WP23 - SA.1b — Technical/scientific Management
- WP24 - SA.2 — Internal Dissemination and Implementation
- WP25 - SA.3 — External Dissemination
- WP26 - SA.4 — Advisory Group of Ship Operators









